Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 17 results ...

Back, W E and Bell, L C (1995) Quantifying Process Benefits of Electronic Data Management Technologies. Journal of Construction Engineering and Management, 121(04), 415–21.

Barras, G C and Mayo, R E (1995) Minidirectional Drilling for Installation of Underground Electrical Conduit. Journal of Construction Engineering and Management, 121(04), 364–9.

Beliveau, Y J, Williams, J M, King, M G and Niles, A R (1995) Real-Time Position Measurement Integrated with CAD: Technologies and Their Protocols. Journal of Construction Engineering and Management, 121(04), 346–54.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(1995)121:4(346)
  • Abstract:
    The consortium for advanced positioning system (CAPS) was formed in December 1992. The purpose of CAPS is to assist the Civil Engineering Research Foundation (CERF) with a Cooperative Research & Development Agreement (CRDA). CAPS will field and test a new real-time laser-based technology, real-time differential global positioning systems (DGPS), and total stations to determine areas of functionality and how to best integrate these measurement devices to improve the work process and as-building capabilities. The founding members of CAPS are Spatial Positioning Systems, Inc., Blacksburg, Virginia; Jacobus Technology, Inc., Gaithersburg, Maryland; Bechtel Corporation, San Francisco, California; and CERF, Washington, D.C. Integraph Corporation Huntsville, Alabama, joined CAPS in May 1993. The U.S. Army Corps of Engineers (Corps) is participating in CAPS through a CRDA with CERF. The objective of the CRDA is to create and field-test a system that improves quality, speed, and accuracy of construction layout and generates real-time as-builts. This effort encompasses the integration of the aforementioned new laser-based positioning system, total stations, and DGPS with computer-aided design (CAD)/ systems to form a real-time construction layout and as-built development system (RtCLADS). This paper presents three positioning technologies, their capabilities, their limitations, and the protocol needed to support the objectives of the CRDA.

Dias, A and Ioannou, P G (1995) Debt Capacity and Optimal Capital Structure for Privately Financed Infrastructure Projects. Journal of Construction Engineering and Management, 121(04), 404–14.

Diekmann, J E and Girard, M J (1995) Are Contract Disputes Predictable?. Journal of Construction Engineering and Management, 121(04), 355–63.

Elzarka, H M and Bell, L C (1995) Object-Oriented Methodology for Materials-Management Systems. Journal of Construction Engineering and Management, 121(04), 438–45.

Hanlon, E J and Sanvido, V E (1995) Constructability Information Classification Scheme. Journal of Construction Engineering and Management, 121(04), 337–45.

Herbsman, Z J (1995) A+B Bidding Method—Hidden Success Story for Highway Construction. Journal of Construction Engineering and Management, 121(04), 430–7.

Hinze, J, Bren, D C and Piepho, N (1995) Experience Modification Rating As Measure of Safety Performance. Journal of Construction Engineering and Management, 121(04), 455–8.

Jeljeli, M N and Russell, J S (1995) Coping with Uncertainty in Environmental Construction: Decision-Analysis Approach. Journal of Construction Engineering and Management, 121(04), 370–80.

Kangari, R (1995) Risk Management Perceptions and Trends of U.S. Construction. Journal of Construction Engineering and Management, 121(04), 422–9.

Kim, J and Ibbs, C W (1995) Work-Package–Process Model for Piping Construction. Journal of Construction Engineering and Management, 121(04), 381–7.

Liu, L, Burns, S A and Feng, C (1995) Construction Time-Cost Trade-Off Analysis Using LP/IP Hybrid Method. Journal of Construction Engineering and Management, 121(04), 446–54.

Riley, D R and Sanvido, V E (1995) Patterns of Construction-Space Use in Multistory Buildings. Journal of Construction Engineering and Management, 121(04), 464–73.

Senior, B A (1995) Late-Time Computation for Task Chains Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 397–403.

Smith, S D, Osborne, J R and Forde, M C (1995) Analysis of Earth-Moving Systems Using Discrete-Event Simulation. Journal of Construction Engineering and Management, 121(04), 388–96.

Thomas, H R, Smith, G R and Cummings, D J (1995) Enforcement of Liquidated Damages. Journal of Construction Engineering and Management, 121(04), 459–63.